Water heaters & hot water
Sizing, tank or tankless, venting, recirculation, mixing valves. Homes and commercial.
RPZ and double-check devices: DEP-approved plan, installation, the yearly test, the report to DEP.
01 · The problem
A boiler fill with treatment chemicals, a kitchen with chemical dispensers, an irrigation line: any of them can push or pull dirty water back toward the city main when the pressure changes. DEP orders a device where the hazard calls for one, mails a reminder when the yearly test is due, and can fine the owner or shut off the water service when a test is missed.
02 · The system
The device follows the hazard: RPZ for high hazard, double check (DCVA) for low hazard. Vacuum breakers protect single fixtures and hose connections; DEP does not accept them as the main device. Sized to the service, set where it can be tested and drained, the RPZ relief discharging through an air gap to a drain sized for full flow.
03 · The fix
The device is picked by hazard. A PE or RA draws the plan and DEP approves it. The device is installed, tested by a New York State-certified tester, and the report goes to DEP within 30 days. Then the same test every 12 months. Failed devices are rebuilt with the manufacturer kit or replaced.
New York City: Brooklyn, Queens, Manhattan, the Bronx and Staten Island. PlumbHub LLC is a plumbing project contractor. Permitted plumbing work in New York City is filed, supervised and signed off by the New York City Licensed Master Plumber engaged for each project.
Sizing, tank or tankless, venting, recirculation, mixing valves. Homes and commercial.
Failed galvanized, old stacks, corroded risers. Replaced in phases in occupied buildings.
Restaurants, retail, offices, medical. Demolition to close-out under a GC schedule.
Call or text with the symptom, or send photos and the layout for an estimate.